Civil / Road Works Work Method Statements

method statement for civil works

If no control measures prescribed in legislation use hierarchy of controls and consult with workers. Information contained in this guide may contain legislation that has be amended or repealed therefore it is strongly recommended that you refer to and read the current laws when using this guide. It is your responsibility to refer to legislation when reading this guide or using any of the tools in the Tool Kit to ensure you are working with the most up to date information. Branches and drain line connections for future use shall be sealed off with proper stoppers, to prevent the ingress of extraneous matter. In-Process Procedure : The execution procedures shall be divided into following sections, which are: a Prime Coat. The course is then raised.

Next

Method Statement for Asphalt Paving Works

method statement for civil works

If the brush begins to drag during application, do no add water to the material, but dampen the surface again. A sequence of operations shall be established which allows the clearance of debris on regular basis such that unnecessary overloads to the existing structures shall be avoided and to maintain a good housekeeping. He has started his career back in 2003 as a site engineer, technical office engineer, planning engineer, planning manager, and finally planning department manager where he has been involved in several mega construction projects in Egypt and Saudi Arabia. Movement joints are not required in the swimming pool tiles since it has got constant temperature. At the nozzle the dry mix will be dehydrates by the nozzle man with the water line valve control and placed in its final position. Necessary excavations with proper shoring shall be made in case of any demolition to be done under the grade level.

Next

Method Statement for Civil Works for Swimming Pool Installation

method statement for civil works

In case of any obstructions or fall of debris on roads, the area shall be cleaned on immediate basis. Division 1 Existing Control Measures Activity Work Area Potential Hazards Insert site address here Insert contract here e. Self propelled rollers and Tandem rollers shall follow the breakdown rolling and sufficient passes shall be made to achieve the required compaction. Do you know which one? Insert steps into this column in the sequence the activity is to be performed. Mix the material with a drill fitted with a suitable mixing paddle and mixing vessel for 2-3 minutes. Decide on control measures to prevent or minimise the level of the risks; d. After work has been finished, the architect from consultant must inspect it.

Next

Method Statement for Demolition Work

method statement for civil works

The second coat should also be applied at a minimum wet film thickness of 1 mm and finished in one direction. Selected fill material in maximum 150 mm layers shall be placed up to the crown of the pipe and compacted by hand ramming. The joint shall be cleaned well by compressed air and tack coat material shall be applied on the vertical and horizontal surface for better bonding. The roller shall be capable of reversing without backlash and shall be free from worn parts. Backfilling shall not commence until the system has been successfully tested and accepted. Surface Preparation All concrete surfaces will be cleaned from any dust, grease, oil, curing agents, and other contaminant. Ensure those plant operators and operatives involved with the activity are fully aware of the location of the various utilities and underground services and their respective depths.

Next

Method Statement for Civil Works

method statement for civil works

Entering trench more than 1. The method statement sets out the sequence of activities that need to be carried out to complete the work and the controls that will be put in place to ensure safety. Working near underground services Insert risk score using Risk Matrix - Form C 4 This form can also be used to review existing control measures. Hany provided more than 3,500 hours of planning and project management training on his website planningengineer. In the tile finish the expansions joints will be provide if the expansion joint will be there in the main structure.

Next

Method Statement for Asphalt Paving Works

method statement for civil works

The hierarchy of control measures will help you to decide on the most appropriate control measures. The Regulation stipulates that they are to be prepared for high risk construction activities, prescribed activities and for some demolition work. Division 1 Potential Hazards Activity Work Area all steps in activity Insert site address here Insert contract here e. Extremely good care shall be taken when asphalt is laid at construction joints. Lay one brick at the corner and then press with hand, so that thickness of the bed-joint remains only about 10mm. Method Statement for Civil Works: 1. After obtaining approval, pool can be filled with water.

Next

method statement for civil works Archives

method statement for civil works

Laying of reinforcement must be inspected and approved by consultant. Principal Contractor The Principal Contractor for construction work, other than prescribed construction work, is the person appointed by the client as the Principal Contractor for the construction work. Check the plumb and alignment thoroughly. This surface shall be cured for 24 hours. The roller shall be capable of reversing without backlash and shall be free from worn parts. Existing Control Measures Potential Hazards Insert potential hazards associated with contract and site in this column This form can also be used to review existing control measures.

Next

Safety Method Statement for Construction

method statement for civil works

This shall be carried out in sections as work proceeds. It also allows them to prioritise risks, factor in control measures and their costs. Safety Method Statements should include all the in a a risk assessment. The cementitious waterproof coating liquid polymer usually 5 kg is poured from the plastic container into a plastic or metal drum having a volume of at least 20 litres to this, the powder is gradually added 18 kg. The first task is to carry out a Risk Assessment, for details of how to do this please click.

Next

What is a method statement and how do I write one

method statement for civil works

Insert existing controls in this column if reviewing control measures E. During demolition of concrete structures, suitable temporary supports shall be made to existing structure. The first closer is also fixed as the corner brick. In any circumstances where specifications are not provided or they are in any way incomplete, the matter shall be referred back to consultant for additional information. In some cases a combination of control measures are required to manage the risks where the hazard cannot be eliminated. Site Preparation Insert work area e.